Overall goal


The Dagachhu Hydropower project is located in the South-Western part of Bhutan on the left bank of the Dagachhu river. The project is a run-of-river type hydropower plant and envisages an installed capacity of 114 MW.


In 2007, the Austrian Development Cooperation provided grant assistance to the Royal Government of Bhutan for the preparation of tender documents for a Dagachhu Hydropower project. The preparation of the tender documents has been completed. The tenders for the civil works were opened and evaluated in October 2008. The opening and evaluation of tender for the Electrical and Mechanical equipment took place in November 2008. The project is well on track and the construction of the hydropower plant is expected to commence in February 2009.


Since the DHPC does not have the capacity to supervise and monitor the implementation of a hydropower plant of this size, the Royal Government of Bhutan has requested for a grant to finance technical assistance. Therefore, the objective of this project is to assist the DHPC in its function as project owner to monitor and ensure the timely execution with the specified quality of all work. By working jointly with experienced experts, the DHPC team shall (after completion of this contract) be in a better position to fulfill their functions safeguarding the interests of the Royal Government of Bhutan in future hydropower projects. This project aims to ensure the successful completion/commissioning of the 114 MW hydropower project and the transfer of know how to the Bhutanese engineers/technicians.

project number 2296-00/2009
source of funding OEZA
sector Energiegewinnung /erneuerbare Energiequellen
tied
modality
marker
  • Policy marker: are used to identify, assess and facilitate the monitoring of activities in support of policy objectives concerning gender equality, aid to environment, participatory development/good governance, trade development and reproductive, maternal, newborn and child health. Activities targeting the objectives of the Rio Conventions include the identification of biodiversity, climate change mitigation, climate change adaptation, and desertification.
    • 1= policy is a significant objective of the activity
    • 2= policy is the principal objective of the activity
  • Donor/ source of funding: The ADA is not only implementing projects and programmes of the Austrian Development Cooperation , but also projects funded from other sources and donors such as
    • AKF - Foreign Disaster Fund of the Austrian federal government
    • BMLFUW - Federal Ministry for Agriculture, Forestry, Environment and Water
    • EU - Funds of the European Commission
    • Others - various other donors are listed in ADA’s annual business report.
  • Type of Aid – Aid modalities: classifies transfers from the donor to the first recipient of funds such as budget support, core contributions and pooled programmes and funds to CSOs and multilateral organisations, project-type interventions, experts and other technical assistance, scholarships and student costs in donor countries, debt relief, administrative costs and other in-donor expenditures.
  • Purpose/ sector code: classifies the specific area of the recipient’s economic or social structure, funded by a bilateral contribution.
  • Tied/Untied: Untied aid is defined as loans and grants whose proceeds are fully and freely available to finance procurement from all OECD countries and substantially all developing countries. Transactions are considered tied unless the donor has, at the time of the aid offer, clearly specified a range of countries eligible for procurement which meets the tests for “untied” aid.